| MATTSON TECHNOLOGY
RECEIVES MULTIMILLION DOLLAR ORDER FOR HIGH THROUGHPUT CVD
SYSTEMS
New 200/300mm CVD System Provides Bridge Tool Capability
Fremont, Calif. — January 17, 2000 — Mattson
Technology, Inc. (Nasdaq: MTSN), a leading supplier of advanced
process equipment used to manufacture semiconductors, today
announced that it has received an order exceeding $9 million
dollars from a major DRAM manufacturer for multiple Aspen
III CVD systems, plasma enhanced chemical vapor deposition
equipment. Built on Mattson's unique Aspen III platform,
the system offers the industry's highest throughput for thin
film applications. The high throughput, combined with Mattson's
three-year all-inclusive warranty, provides a cost of ownership
advantage over competitive CVD systems. Since its market
introduction in first quarter, 1999, the Aspen III CVD system
has quickly gained market acceptance with the receipt of
multiple orders in 1999. The systems are scheduled to be
shipped in the second quarter, 2000.
The 200/300mm bridge tool can use the same chamber to process
either 200mm or 300mm wafers. Mattson Technology continues
to work closely with key customers in Japan, North America
and Europe to ease the transition from 200mm to 300mm wafer
processing. The company has more than 20 Aspen III tools
installed at leading-edge semiconductor facilities around
the world, running both 200mm and 300mm processes in production.
"We are continuing our aggressive launch of the new
Aspen III CVD. These orders are a major achievement for a
new product in a competitive market like CVD, " said
Brad Mattson, CEO of Mattson Technology. "By designing
the Aspen III CVD to use the same process chamber for both
200mm and 300mm processing, we will be able to prove the
system's capabilities in production before the changeover
to 300mm manufacturing occurs," he added.
The Aspen III CVD system deposits silane-based films such
as oxide, oxynitride and nitride, as well as TEOS-based (tetraethylorthosilicate)
oxide films. Mattson offers a full suite of PE CVD applications:
ARC layers for excellent CD control; etch stop layers for
use with low k materials; passivation layers; IMD underlayers,
low temperature capping layers; and low k FSG layers. Depending
on the type of film deposited, the Aspen III CVD has the
capability to process up to 180 wafers per hour - a higher
throughput than the original Aspen II CVD system, which set
new industry standards when it was introduced in 1994.
BRIDGING THE GAP BETWEEN 200MM & 300MM MANUFACTURING
The Aspen III CVD system is the first true CVD bridge system
in the industry. While other 300mm systems may require new
process chambers to convert to 200mm, the Aspen III CVD can
be converted to either 200mm or 300mm manufacturing with
only a few minor modifications to the cassette or FOUP stations.
The flexible system design addresses the needs of large volume
manufacturing where cost is a major consideration. Aspen
III CVD has the smallest footprint available in 200 and 300
mm PECVD tools and provides up to a 50 percent throughput
advantage for selected thin film applications.
About Mattson Technology
Mattson Technology Inc., is a leading supplier of thermal,
plasma and wet semiconductor processing equipment. The company's
products combine advanced process technology on a high productivity
platform, backed by industry-leading support. Since beginning
operations in 1989, the company's core vision has been to
help bring technology leadership and productivity gains to
semiconductor manufacturers worldwide. Headquartered in Fremont,
Calif., the company maintains sales and support centers throughout
the United States, Europe, Asia/Pacific and Japan. For more
information, please contact Mattson Technology Inc., 2800
Bayview Drive, Fremont, Calif. 94538. Telephone: (800) MATTSON.
Fax: (510) 657-0165. Internet:www.mattson.com
|